Project: MATOC: Repair Exterior of Building J00100

Client US Army Corps of Engineers
Anticipated Completion: June 2017

This project includes removal of dirt, moss, tar, mold, mildew, efflorescence, pollutant crusts, bird dropping, pain and vegetation on concrete foundation, concrete retaining walls, concrete columns, concrete entry portals, concrete window sills, concrete porch floors and porch ceiling, concrete bollards and bands, caps an coping of concrete exterior walls, concrete pilasters and concrete panels under windows and stone stoops. Repair and patch surfaces. Remove existing paint and steel railings, metal window frames, metal screen railings, metal stairs and stair railings.
     
 

click on above photos to enlarge

<< Return to the list of projects